LINE

Text:AAAPrint
Video

Meizhou-Longchuan high-speed railway completes girder erection construction

2023-11-03 11:35:01Ecns.cn Editor : Luo Pan ECNS App Download

With a 24.6-meter-long box girder falling steadily into place on the bridge on Wednesday, the erection task of all box girders along the Meizhou-Longchuan high-speed railway was officially completed.  

The high-speed railway will be 94 kilometers long when completed. The railway starts from Meizhou West Railway Station and passes through Meixian County, Xingning City, Wuhua County in Meizhou and Longchuan County in Heyuan before terminating at Longchuan West Station, an interchange station with the Ganzhou-Shenzhen high-speed railway.  

The railway is the first railway project independently invested and constructed by south China's Guangdong Province with a design speed of 350 kilometers per hour. The trip from Meizhou to Guangzhou and Shenzhen will be shortened from 6 hours to 1.5 hours when the railway goes into operation in June 2024.   Known as the "Capital of Hakka in the World," Meizhou is home to millions of Hakka people, whose ancestors were believed to have moved from central China to the south centuries ago.  

MorePhoto

Most popular in 24h

MoreTop news

MoreVideo

LINE
Back to top About Us | Jobs | Contact Us | Privacy Policy
Copyright ©1999-2023 Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.
[网上传播视听节目许可证(0106168)] [京ICP证040655号]
[京公网安备 11010202009201号] [京ICP备05004340号-1]