Train and signal testing has started today on the Shanghai Metro Disney Line, an extension of Line 11. The 9.15-kilometer line starts from Line 11's Luoshan Road Station with stops at Xiuyan Road and Kangxin Road before reaching Disney Station.
Train and signal testing has started today on the Shanghai Metro Disney Line, an extension of Line 11.
The 9.15-kilometer line starts from Line 11's Luoshan Road Station with stops at Xiuyan Road and Kangxin Road before reaching Disney Station.
Shanghai Disneyland is expected to open in the spring of 2016.
Shanghai Disney to open doors next year
2015-02-05Shanghai Disney Resort unveils designs
2014-11-14Shanghai Disney Resort to hire thousands of graduates
2014-09-26Copyright ©1999-2018
Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.